Description
Required Equipment To Operate Attachment
- EDDY Pump circuit requirements from excavator auxiliary power OR from Hydraulic Power Unit 130-150 GPM at 5000 PSI (500cc motor)
- Jetting Ring Agitator. Water Pump Requirements, GPM 400-1000 at 150 PSI Max
- 10” material handling discharge hose and hydraulic lines plumbed out to the end of the boom
- Crossover check valve to prevent damage to hydraulic motor and prevent pump rotor from coming off
Optional Equipment To Enhance Operation Of Dredge
- Magnetic flow meter
- Discharge line pressure gauge (0-150 psi)
- “Quick Prime” Valve (requires small 24-volt air system)
- Pivot mounted Discharge hose carrier (adaptable to most machines)
- Cable Hung Unit Can Convert to be Compatible with Liner Safe Roller Attachment and Self Cleaning Mud Guard
- Recirculation system for pre-mixing applications (requires small 24-volt air system)
Recommended Sensors
- Hydraulic Pressure Gauge for pump circuit to operator (0-6000 PSI)
- Magnetic Flow meter to maintain stable plug free pipeline flow and maximize production
Reviews
There are no reviews yet.